Diagnosis should come before excavation
Excavation should be tied to evidence. A sewer camera may show a break or obstruction; a locator helps map the finding; water-line problems may require leak detection, meter observations, or other tests. No single tool answers every question, so the proposal should identify what is known, what is inferred, and what might change once the line is exposed.
Utility marking is not optional
Dig Safe/811 marks participating underground utilities before excavation. Markings do not replace a contractor’s site planning, and privately owned lines may require separate locating. No homeowner should be asked to treat an unmarked site as ready for digging.
Access can determine the method
The shortest pipe route is not always the safest equipment route. Fences, trees, overhead wires, septic components, retaining walls, driveways, property boundaries, and neighboring access can affect the project. Ask where the excavator, trucks, and removed material will go and which surfaces must be disturbed.
Backfill and restoration are separate promises
Backfill closes the excavation and supports the repaired line. Restoration returns the visible surface toward its agreed condition. A plumbing/excavation proposal should state whether it includes rough grading, seed, sod, asphalt, concrete, pavers, irrigation, plantings, or none of those items. “Backfilled” does not automatically mean “landscaping restored.”